← All projects

Palm oil · 2023

Palmmaster 5000, missing spare parts replaced

The Siemens solid state relays in the Palmmaster 5000 separator were no longer available. I swapped in ABB and cleaned up the drawings.

Client
PT GEA Westfalia Separator Indonesia
Year
2023
Location
Riau
My role
Design
Delivered through
Firmansyah.co, as subcontractor to PT GEA Westfalia Separator Indonesia

Layers worked on

  1. 01Field
  2. 02Logic
  3. 03Telemetry
  4. 04Screen

What we did

  1. 01Siemens Sirius solid state relays replaced with ABB SSR10.
  2. 02Revised electrical schematics, terminal schedules and heat dissipation layout.
  3. 03On-site rewiring, remounting, thermal checks and high-current insulation tests in the separator panel.
LocationRiau

The result

The separator is maintainable again, and the client holds verified as-built drawings.